Overhead transmission line and catenary construction; standardization of insulating tapes and insulators; clearances for third rail and overhead working conductors; specifications for track and third-rail bonds; illumination; design of indoor and outdoor substations; high-tension cables; application of corrosion-resisting materials to railroad. (see also Ry. Elec. Engr., vol. 20, no. 4, Apr. 1929, pp. 111-112)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Report of committee XVIII -- Electricity


    Additional title:

    Am. Ry. Eng. Assn. -- Bul



    Publication date :

    1928


    Size :

    75 pages


    Remarks:

    9 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English


    Keywords :


    Report of committee XVIII -- Electricity

    Engineering Index Backfile | 1936


    Report of committee XVIII -- Electricity

    Engineering Index Backfile | 1935


    Report of committee XVIII -- Electricity

    Engineering Index Backfile | 1937


    Report of committee XVIII -- Electricity

    Engineering Index Backfile | 1932


    Report of committee XVIII -- On electricity

    Engineering Index Backfile | 1916