Description of new power signal installation at Capetown terminus, South African Railways; headway reduced from 150 to 90 sec.; general arrangement; signals and route indicators; time release instruments; control of crossover movements; track circuits; power supply.
Resignalling of Capetown suburban lines
Modern Transport
Modern Transport ; 21 , n 536
1929
2 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
Engineering Index Backfile | 1937
Engineering Index Backfile | 1937
Resignalling the Jubilee and Northern Lines
British Library Online Contents | 2006
A modular approach to resignalling
IuD Bahn | 2011
|