Cantilever erection of 518-ft. center span outside of old span under traffic. Adjacent anchor spans moved longitudinally and heavy girder ties shortened for erection adjustments. Center panel erection connections adjusted by jacking up ends of connected spans.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Kenova bridge channel span erection


    Additional title:

    Public Works


    Published in:

    Public Works ; 48 , n 19


    Publication date :

    1920


    Size :

    3 pages


    Remarks:

    4 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Kenova bridge end span erection

    Engineering Index Backfile | 1920


    BRIDGE ERECTION BOAT

    STAVITSKIJ YURIJ MIKHAJLOVICH / ALAKHVERDIEV RUSLAN SABIROVICH / VOROBEV IVAN SEMENOVICH et al. | European Patent Office | 2017

    Free access


    Erection of girder span imposes serious problem

    Engineering Index Backfile | 1927


    Bridge girder erection motorboat

    WANG WEI / LIU YANG / ZHOU JIAN et al. | European Patent Office | 2021

    Free access