Details of the electric equipment of the section Bevers-Filisur-Thusis (length, 54,415 km. including 15,868 km. tunnel) and section Filisur-Davos (length, 21,944 km. including 4212 km. tunnel). Main data are: Gage, 1 m.; maximum ascent, 35 deg.; smallest curve radius on open road, 100 m.; maximum speed, 45 km. per hr.; maximum height of trolley wire above rails on open road, 5200 mm., and in tunnel 4150 mm.; cost of construction, 64,000 Fr. per km.
The electrification of the Rhaetian railway
Von der Elektrifizierung der Rhatischen Bahn
Schweizerische Bauzeitung ; 75 , n 20
1920
4 pages
19 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Conclusion of the work of electrification of Rhaetian railway
Engineering Index Backfile | 1922
|British Library Online Contents | 2002
|Online Contents | 2002
|Locomotives on the Rhaetian railway
Engineering Index Backfile | 1914
Vehicle localisation on the Rhaetian Railway
IuD Bahn | 2008
|