Report by Clifford M. Holland, Chief Engineer of New York State Bridge and Tunnel Commission and New Jersey Interstate Bridge and Tunnel Commission. Twin tubes of cast iron, 29 ft. in diameter are recommended. Project is to cost $28,669,000. Operating revenues are expected to amortize cost in 11 years and produce surplus of $66,500,000 in 20 years.
Largest american shield tunnel designed to carry vehicular traffic under hudson river
Eng. News-Rec
Engineering News-Record ; 84 , n 8
1920
8 pages
7 Figs.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Tunnel under Hudson designed for vehicular traffic
Engineering Index Backfile | 1917
Engineering Index Backfile | 1923
The Hudson river vehicular tunnel
Engineering Index Backfile | 1927
|Construction methods on vehicular tunnel under the Hudson River
Engineering Index Backfile | 1927
Progress on the Hudson River vehicular tunnel
Engineering Index Backfile | 1923
|