Installation of automatic block signaling on 26 mi of single track between Union, Neb, and Gilmore Junction, completed by Missouri Pacific Railroad; automatic signaling is controlled on absolute permissive block system; notes on character of line, spring switch layouts, plates and rail braces, railroad crossing gate, instrument housings, a-c floating power system, underground cable construction, and special switch stand adjuster.
New automatic blocks on Missouri Pacific
Ry Signaling
Railway Signaling ; 31 , n 12
1938
5 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Automatic train control on Missouri Pacific Ry.
Engineering Index Backfile | 1924
A.C. -- Primary system for automatic interlocking on Missouri Pacific
Engineering Index Backfile | 1935
Missouri Pacific freight power
Engineering Index Backfile | 1944
Engineering Index Backfile | 1938
Engineering Index Backfile | 1944
|