Illustrated description of tunnel under construction which provides four tracks for motor traffic and additional tracks for bicyclists and pedestrians; it is not being driven under river by usual shield method, but separate sections are being constructed ashore, floated out, and sunk through water into dredged channel prepared to receive them.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Meuse tunnel at Rotterdam


    Additional title:

    Engineer


    Published in:

    Engineer ; 168 , n 4369


    Publication date :

    1939


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English