An illustrated description of this line, about to be opened for public traffic. It is 6 1/2 miles long, entirely under ground, and particularly interesting because of some novel methods adopted in boring the tunnels, and in view of the fact that the cable traction plant installed is one of the largest and probably the most complete yet laid down. (Serial)
The Glasgow subway and cable traction
Engng
1896
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1933
Engineering Index Backfile | 1898
Engineering Index Backfile | 1942
Engineering Index Backfile | 1942
Engineering Index Backfile | 1897