Reported at the meeting of the Assn. of Ry. Supts. of Bridges and Buildings. Describes repairs without falsework to a structure 117 ft. high and 440 ft. long, without delay of trains. (1400 w.)
Viaduct alterations without the use of falsework
Ry Engng Rev
1899
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Erecting seven simple spans without falsework
Engineering Index Backfile | 1924
Engineering Index Backfile | 1893
Bailey falsework for truss bridge repairs
Engineering Index Backfile | 1950
|Falsework on wheels places railroad bridge in halves
Engineering Index Backfile | 1936
Preboring pile holes simplified this falsework problem
Engineering Index Backfile | 1941