Designed to give complete metallic contact for the trolley connection the entire length of the bridge when the draw is closed. (600 w.)
Overhead trolley construction on new drawbridge in New York
St Ry Jour
1898
Ill.
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Drawbridge interlocking on New York Central
Engineering Index Backfile | 1946
Specifications for overhead trolley construction
Engineering Index Backfile | 1913
Overhead construction for trolley bus
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
Engineering Index Backfile | 1929
|