Designed to give complete metallic contact for the trolley connection the entire length of the bridge when the draw is closed. (600 w.)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Overhead trolley construction on new drawbridge in New York


    Additional title:

    St Ry Jour



    Publication date :

    1898


    Remarks:

    Ill.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Drawbridge interlocking on New York Central

    Engineering Index Backfile | 1946


    Specifications for overhead trolley construction

    Engineering Index Backfile | 1913


    Overhead construction for trolley bus

    Engineering Index Backfile | 1929


    Drawbridge circuit controller

    Engineering Index Backfile | 1929


    Drawbridge safety gates

    Hargrove, J.W. | Engineering Index Backfile | 1929