Six large sluice gates being transported to site; with assistance of specially designed traveling crane, gates were lifted up from truck and transported across dam and lowered into their respective positions between piers; complete design, manufacture and erection of gates was carried out by Glenfield and Kennedy.
Sluice gates for glenlochar barrage
Engineer
Engineer ; 154 , n 3991
1932
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Sluice gates and regulators for Sukkur irrigation undertaking
Engineering Index Backfile | 1932
Sluice gates and regulators for Sukkur irrigation undertaking
Engineering Index Backfile | 1932
Great sluice gates of the nile irrigation works
Engineering Index Backfile | 1901