Overhauling of power plants done at system shops; use of good tools in engine-bearing work makes for speed, accuracy and economy; review of maintenance operations.
Gas-electric rail car maintenance on Lehigh valley
Ry Elec Engr
Railway Electrical Engineer ; 23 , n 8
1932
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1912
Laying rail on the Lehigh valley
Engineering Index Backfile | 1914
Lehigh valley modernizes the laying of rail
Engineering Index Backfile | 1920
Engineering Index Backfile | 1937
Maintenance methods on the Lehigh Valley R. R.
Engineering Index Backfile | 1924
|