London, Midland and Scottish Railway is introducing method that will eliminate source of great delay to trains that pass through station; tiresome occupancy of main lines at Preston and exchange of engines avoided by use of connecting lines south of Preston; extra journey of 6 mi is made in less time than that taken in reversing and one engine works through to destination.
Roundabout working for railway trains
Engineer
Engineer ; 154 , n 4009
1932
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Bracknell roundabout -- Construction of roundabout under railway
Engineering Index Backfile | 1956
|New Type of Roundabout: Roundabout with “Depressed” Lanes for Right Turning – “Flower Roundabout”
DOAJ | 2011
|