Development of urban transportation system of Chicago; construction of State Street Subway, 3 1/2 mi long, including 1290 ft of tunnels and 210 ft of river tubes; design specifications; river crossings; ramps; subway stations; architectural treatment; ventilation; illumination; drainage; track work; sewers; backfill; estimated cost $44,500,000; assessment proceedings. (See also Mun Engrs J paper 166 third quarterly issue v 18 1932 p 86-114 (discussion) p 115-118)
State street subway of city of Chicago
Gen Contractors Assn -- Bul
General Contractors Association -- Bulletin ; 23 , n 11
1932
6 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Chicago extends subway under La Salle street station
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1931
|Engineering Index Backfile | 1912
Engineering Index Backfile | 1906
The 191st street subway station, New York City
Engineering Index Backfile | 1911