Turbine cycle; allowances and assumptions for calculation; analysis of economics and technical factors in selection of installation for 11,000-shp set; comparison covers first cost, interest charges, maintenance and fuel consumption over periods of 10 and 20 yr. (See also - discussion p 21-36)
Heat balance calculations and their use in installation design of steam turbine merchant ship propulsion machinery
Inst Mar Engrs -- Trans
1958
20 pages
Folding sheet
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Experience with merchant ship propulsion machinery in war
Engineering Index Backfile | 1945
|Steam turbine machinery in a changing scenario for ship propulsion
Tema Archive | 1976
|Merchant ship propulsion gears
Engineering Index Backfile | 1921
|Nuclear Merchant Ship Propulsion
NTIS | 1977
|Propulsion of ships by steam turbine machinery
Engineering Index Backfile | 1958
|