Illustrated description of the material plant, mixer plant, haulage system, etc. (1500 w.) (No. 38322)
Construction plant for the third lock at Sault Ste. Marie, Mich
Eng Rec
1912
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Steel lock gates for 800×100 ft. ship canal lock, Sault Ste. Marie, Mich.
Engineering Index Backfile | 1896
Work on the new lock and canal at Sault Sainte Marie, Mich
Engineering Index Backfile | 1911
Macarthur lock at Sault Ste. Marie
Engineering Index Backfile | 1944
Engineering Index Backfile | 1887
|Engineering Index Backfile | 1887