Project of Los Angeles and Salt Lake at Long Beach, Calif, involved construction of 7.58 mi of new line and six highway subways.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Builds cutoff to take traffic from city streets


    Additional title:

    Ry Age


    Published in:

    Railway Age ; 94 , n 14


    Publication date :

    1933


    Size :

    3 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Traffic on city streets

    Eldridge, M.O. | Engineering Index Backfile | 1929


    Making city streets adequate for traffic load

    Law, J.R. | Engineering Index Backfile | 1947


    City streets

    Ewald, E.H. | Engineering Index Backfile | 1927


    Assignment of traffic to a network of signalized city streets

    Bentley, R.W. / Lambe, T.A. | Elsevier | 1979


    Coordination of Traffic Signals on Arterial Streets in Duhok City

    Dilshad Ali Mohammed / Aso Faiz Talabany | DOAJ | 2021

    Free access