Problem of electrification in Great Britain; of 11,500 route-mi at present electrified 6200 or 55% are electrified with d-c and 1300 route mi of these are equipped with third rail; of 5000 mi of overhead equipment, 2200 mi are at 1500 v and 1900 mi at 3000 v; electricity supply; economics; tables showing railway electrification in different countries, and estimated future of electricity.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Main line electrification


    Additional title:

    Elec Times


    Contributors:

    Published in:

    Electrical Times ; 82 , n 2149


    Publication date :

    1932


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Main line railway electrification

    Dawson, P. / Parker Smith, S. | Engineering Index Backfile | 1925


    Main line railway electrification

    Dawson, P. / Smith, S.P. | Engineering Index Backfile | 1926


    Main line railway electrification

    Dawson, P. / Smith, S.P. | Engineering Index Backfile | 1926


    Main line railway electrification

    Dawson / Phill / Parker Smith, S. | Engineering Index Backfile | 1925


    Main line railway electrification

    Parker Smith, S. / Dawson, Phil. | Engineering Index Backfile | 1924