New track construction and building of new station in connection with electrification of London-Brighton Line of Southern Railway, England; details of cable lead to conductor rail through hook switch; alignment for high-speed running; method of bonding conductor rails and running rails; hook switch for isolating sections of track. (See also Ry Gaz (Supp) Dec 30 1932 p 6-14)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Southern Railway's electrification extension


    Additional title:

    Tramway Ry World


    Published in:

    Publication date :

    1933


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Southern Railway's electrification extension

    Engineering Index Backfile | 1932


    Southern railway's "Pacifics,"

    Tuplin, W.A. | Engineering Index Backfile | 1944


    Electrification of the Swiss railway's Gotthard line

    Dassenbach, F. | Engineering Index Backfile | 1922


    Southern railway's new terminals

    Engineering Index Backfile | 1928


    Southern Railway's modernization of wayside signaling

    McIntyre, F.H. | Tema Archive | 1986