Highway grading methods across marshy soil are described; handling of mucking and sand filling for grade-drain-structure project on Interstate 10 near New Orleans, La where ground level lies at about elevation of -5.0 ft; foundation settlement of about 1 ft is expected under entire roadway before surcharge is removed.
Freeways across marshy low-country -- How it's done in Louisiana
Roads Streets
Roads and Streets ; 107 , n 5
1964
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Construction of narrow-gage railroad in marshy area
Engineering Index Backfile | 1930
|Striping for safety: how it's done the country over
Engineering Index Backfile | 1939
TIBKAT | 1966
|Springer Verlag | 2013
|Navigation of moving vehicles in country roads and freeways
European Patent Office | 2022
|