Study of graphical development including allowable maximum speed acceleration in starting and retardation after braking; measuring trip with recording instruments is preferred over calculating method; work executed by Commission in Elbersfield needs approvel of legal authorities. (See also - no. 41 Oct. 10 1930 pp. 553-556)
Time-schedule planning for street railroads
Die Fahrplanbildung bei Strassenbahnen
Verkehrstechnik ; 43 , n 42
1930
5 pages
10 Figs.
Article (Journal)
German
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1929
Engineering Index Backfile | 1893
Engineering Index Backfile | 1887
|Prerequisites of street railroads
Engineering Index Backfile | 1934
|Pantograph for street railroads
Engineering Index Backfile | 1929
|