Design and construction of sawn creosoted timber railroad bridge, 235 ft high, 1130 ft long, completed in Cowlitz County, Wash, on branch line of Weyerhaeuser Timber Co railroad; details of concrete abutment and three-hinged arches of 120-ft span; details of K-bracings; comparative cost data.
Baird creek bridge
Civ Eng (NY)
Civil Engineering (New York) ; 11 , n 8
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Opening-bridge over barking creek
Engineering Index Backfile | 1904
British Library Online Contents | 2008
|Wildcat Creek Pedestrian Bridge - Design for Safety
British Library Conference Proceedings | 2001
|Concrete Ballast Deck Bridge on White Clay Creek
British Library Conference Proceedings | 1997
|