Bulk cargo loading terminal designed to meet specific requirements of Great Lakes Carbon Corp; bulk loading wharf is 781 ft long and 29 ft wide, and accommodates 2 standard gage railroad tracks; minimum of 4-in. concrete protection outside of all reinforcing steel specified and obtained; wharf handling facilities described; method proposed for handling calcined coke.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Long Beach constructs unique bulk loading facilities in general harbor terminal


    Additional title:

    World Ports


    Contributors:

    Published in:

    World Ports ; 3 , n 1


    Publication date :

    1940


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Port structures in Long Beach Harbor

    Hoffmaster, B.N. / Johnson, C.T. / Vickers, C.L. | Engineering Index Backfile | 1959



    Los Angeles - Long Beach Harbor Complex 2020 Plan Harbor Resonance Analysis

    Sargent, Francis E. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1989

    Free access


    Long Beach Harbor Numerical Analysis of Harbor Oscillations, Report 2: Alternate Plans for Pier J Completion and Tanker Terminal Project

    Houston, James Robert / Port of Long Beach. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 1976

    Free access