Illustrated description; there are seven berths, which are arranged in three building basins; all traveling cranes are of standard design and have lifting capacity of 25 tons at radius of 50 ft.
South Portland shipyard, Maine
Engineer
Engineer ; 172 , n 4464
1941
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Online Contents | 2000
|Engineering Index Backfile | 1936
Engineering Index Backfile | 1937
Engineering Index Backfile | 1931
Board issues revised report on Portland, Maine
Engineering Index Backfile | 1928