Comments and tentative conclusions with reference to system installed in S.S. Examiner, one of 8 cargo ships of Maritime Commission's C-3 E design built by Bethlehem Steel Co; machinery plant consists of single screw, double reduction geared turbines of 8000 shp; steam conditions of 7 vessels are 425 lb and 740 F; "Examiner" differs from other vessels only in portions of high pressure reheat cycle. (Abstract) (See also - discussion p 112, 114 and 116; Soc Naval Architects and Mar Engrs -- Advance Paper n 10 mtg Nov 13 and 14 1941 26 p, 2 supp plates; Combustion v 13 n 6 Dec 1941 p 43)
1200-pound reheat marine installation
Mar Eng Shipg Rev
Marine Engineering and Shipping Review ; 46 , n 12
1941
9 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
1200-pound reheat marine installation
Engineering Index Backfile | 1941
|1,200-pound reheat marine installation
Engineering Index Backfile | 1942
Marine reheat boilers today and tomorrow
Tema Archive | 1978
|High performance reheat marine steam propulsion plant
Tema Archive | 1977
|Norris electric reheat system -- Simplified installation for ship's air conditioning
Engineering Index Backfile | 1966