Illustrates and describes the section between Frankfort and Herkimer, 3.17 miles long, used by steam trains of the West Shore R. R., and also by electric cars of the Utica and Mohawk Valley Ry. (1000 w.) (No. 73792 C)
First electrical operation on the West Shore Railroad
St Ry Jour
1905
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
First electrical operation on the West Shore Railroad
Engineering Index Backfile | 1905
Electrical operation on the west shore railroad
Engineering Index Backfile | 1907
Electrification of the west shore railroad between Utica and Syracuse
Engineering Index Backfile | 1906
Electrical equipment of the west shore
Engineering Index Backfile | 1906
Renewal of a bridge over Rondout creek on the west shore railroad
Engineering Index Backfile | 1904