Following successful sinking of offshore oil wells east of Das Island in Arabian Gulf by Abu Dharbi Marine Areas Ltd, work has begun on building terminal for 65,000-ton oil tankers about 3/4 mi offshore; it was specified that tanker berth should consist of 6 mooring dolphins and 4 berthing dolphins; to enable cylinders to be positioned accurately concrete and steel template was positioned, leveled and grouted to sea bed at position of dolphin.
Tanker terminal for Das Island
Dock Harbour Authority
Dock and Harbour Authority ; 42 , n 498
1962
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
British Library Online Contents | 2000
Engineering Index Backfile | 1944
Engineering Index Backfile | 1941
British Library Online Contents | 2000
British Library Online Contents | 1999