Illustrated description of construction of 56 mi of 6-in. line from Indian refinery at Lawrenceville, Ill, to Mount Vernon, Ind; storage at terminal will be handled by four 35,000-bbl and three 15,000-bbl tanks; floating loading barge will be used on river; railroad tank car loading terminal will also be constructed.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New Illinois-Indiana Pipe line using mill-wrapped pipe


    Additional title:

    Oil Gas J


    Contributors:

    Published in:

    Oil and Gas Journal ; 39 , n 4 ; p 45-46


    Publication date :

    1940


    Size :

    2 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Texas - Illinois communications - microwave facilities adopted to handle pipe-line traffic

    Bulla, W.T. / Upson, C.E. | Engineering Index Backfile | 1951



    Understanding the Illinois Flexibility Index Test (I-FIT) using Indiana Asphalt Mixtures

    Batioja-Alvarez, Dario / Lee, Jusang / Haddock, John E. | Transportation Research Record | 2019



    Automobile line pipe clamp

    LIU CHENG / FENG DONGYA / WANG LIN et al. | European Patent Office | 2024

    Free access