Design and construction of traffic circle on Queen Elizabeth Way at Hamilton, Ont, underpassing single-track railway line that cuts across its diameter; bulk excavation; drainage system; concrete pavement.
Design of Stoney Creek Traffic Circle
Roads Bridges
Roads and Bridges ; 78 , n 7
1940
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
NTIS | 1971
|Nonconforming Traffic Circle Becomes Modern Roundabout
British Library Conference Proceedings | 1994
|