Details of centralized traffic control installed by Nashville, Chattanooga and St. Louis Railroad, on 92 mi of Nashville division between Bruceton, Tenn, and Nashville, as well as on 111 mi of Chattanooga division between Nashville and Stevenson, Ala; except for 4 mi through Nashville terminal, centralized control is continuous for 207 mi between Bruceton and Stevenson. (see also Ry Signaling v 38 n 11 Nov 1945 p 758-65)
C.T.C. on 207 miles of Dixie Route
Ry Age
Railway Age ; 119 , n 16
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
C.T.C. on 207 miles of Dixie Route
Engineering Index Backfile | 1945
C.T.C. installed on Dixie line
Engineering Index Backfile | 1948
Cotton belt installs 121 miles of C.T.C.
Engineering Index Backfile | 1946
Pennsylvania installs C.T.C. on 69 miles of line
Engineering Index Backfile | 1941
C.T.C. installed on 128 miles of N.K.P.
Engineering Index Backfile | 1950