Investigation of subsurface conditions carried out as preliminary step to construction of Toronto subway; general geology of Toronto urban area discussed; procedure and equipment used in test boring and soil sampling described; results of soil tests.
Soil studies for Toronto subway
Roads Bridges
Roads and Bridges ; 83 , n 2
1945
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1953
Engineering Index Backfile | 1953
Victoria park avenue subway, Toronto
Engineering Index Backfile | 1939
|Electric rolling stock for Toronto subway
Engineering Index Backfile | 1954
Signalling on Yonge street subway, Toronto
Engineering Index Backfile | 1955