Wind tunnel to be placed in operation at Pasadena is financed and owned by 4 companies, Consolidated Vultee, Douglas, Lockheed, and North American; unit is variable pressure, variable density, high speed tunnel, with working area having cross-section dimensions of 8 1/2 × 12 ft. (See also - n 1 July 1 1945 p 59-63, 138, 142; Automotive and Aviation Industries v 92 n 10 May 15 1945 p 20-3, 96, 98, 100)
Southern California cooperative wind tunnel
Aero Digest
Aero Digest ; 50 , n 5
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Southern California cooperative wind tunnel
Engineering Index Backfile | 1945
High-speed testing in southern California cooperative wind tunnel
Engineering Index Backfile | 1948
|Wind-tunnel at California Institute of Technology
Engineering Index Backfile | 1929
|