Introduction of electric traction between Shenfield and Southend-on-Sea in Eastern Region of British Railways on Dec 31, 1956, marked completion of scheme, first part of which was placed in operation in 1949; power supply obtained from Eastern Electricity Board at 33 kv three phase; rolling stock consists of 32 all steel 4-coach multiple unit sets; control and protection. (see also Engineering v 183 n 4739 Jan 4 1957 p 25-6)
Railway electrification continued
Engineer
Engineer ; 203 , n 5268
1957
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Railway electrification continued
Engineering Index Backfile | 1957
Engineering Index Backfile | 1956
|Engineering Index Backfile | 1943
|Engineering Index Backfile | 1923
|Engineering Index Backfile | 1909
|