Layout of pilot scheme on 93 1/2 mi section between Heany and Gwelo; in 1954, 729 trains per mo were operated with average delay of 14 min per train as against 714 trains with 45 min delay before installation of new signal system.
Centralised traffic control on Rhodesia Railways
Ry Gaz
Railway Gazette ; 103 , n 16
1955
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralised traffic control on Netherlands railways
Engineering Index Backfile | 1966
Engineering Index Backfile | 1950
|Engineering Index Backfile | 1899
Engineering Index Backfile | 1896
The Rhodesia railways, limited
Engineering Index Backfile | 1905