Illustrated descriptive notes; 176 mi light oil line was originally designed to carry estimated 85,000 bbl daily; at time of completion, July 7 1946, addition of booster pump station had increased capacity to 110,000 bbl; later addition of booster pump further increased capacity.
California standard's 18 in. San Joaquin line shipping 125,000 bbl. crude daily
Oil Gas J
Oil and Gas Journal ; 46 , n 20
1947
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1955
|Jersey standard's tanker Esso Zurich
Engineering Index Backfile | 1952
To Build the System of Logistics Standard's Testing Technique
British Library Online Contents | 2004
|STEEL .5 Ni .5 Cr .25 Mo (.38 - .43 C) (125,000 T.S.)
SAE Technical Papers | 1942
American standard's auto group inks China deal
Online Contents | 1996