Description and diagrams presented, showing sequence of operations adopted by London Transport to facilitate laying 300-ft rails in tube tunnel with aid of temporary overhead runway attached to upper segments of tube lining.
Modern tube tracklaying
Ry Gaz
Railway Gazette ; 86 , n 16
1947
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1909
|Engineering Index Backfile | 1939
Engineering Index Backfile | 1895
Automotive engineering | 1983