Improvement work carried out on two mountain lines to remove "infringements"; novel methods and equipment employed to enlarge several double track tunnels and daylight two other tunnels; all of work done under traffic, with only periodic "traffic or occupational blocks".
Getting more elbow room on Great Indian Peninsula Railway
Ry Eng Maintenance
Railway Engineering and Maintenance ; 47 , n 4
1951
4 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
New dynamometer car, Great Indian Peninsula railway
Engineering Index Backfile | 1930
New dynamometer car, Great Indian Peninsula railway
Engineering Index Backfile | 1930
New dynamometer car, Great Indian Peninsula railway
Engineering Index Backfile | 1930
Electrification of the great Indian Peninsula Railway
Engineering Index Backfile | 1925
New military trains -- Great Indian Peninsula railway
Engineering Index Backfile | 1916