Wellington highway and street railroad tunnel under Lachine Canal has difference in elevation between two levels which creates drainage problem; ground drains were installed along walls on each side of roadway, granite paving blocks used to reduce noise and special paint applied to tunnel walls to increase lighting effects.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Traffic conditions improved in Montreal tunnel


    Additional title:

    Roads Bridges


    Contributors:

    Published in:

    Publication date :

    1945


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Montreal traffic survey

    Engineering Index Backfile | 1938


    Traffic engineering in Montreal

    Genest, A. | Engineering Index Backfile | 1953


    Completing the Mount Royal tunnel into Montreal

    Engineering Index Backfile | 1916


    Rolling stock for Montreal tunnel and terminal

    Lancaster, W.C. | Engineering Index Backfile | 1914


    Completing the Mount Royal tunnel into Montreal

    Engineering Index Backfile | 1915