Wellington highway and street railroad tunnel under Lachine Canal has difference in elevation between two levels which creates drainage problem; ground drains were installed along walls on each side of roadway, granite paving blocks used to reduce noise and special paint applied to tunnel walls to increase lighting effects.
Traffic conditions improved in Montreal tunnel
Roads Bridges
Roads and Bridges ; 83 , n 12
1945
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1938
Traffic engineering in Montreal
Engineering Index Backfile | 1953
|Completing the Mount Royal tunnel into Montreal
Engineering Index Backfile | 1916
Rolling stock for Montreal tunnel and terminal
Engineering Index Backfile | 1914
|Completing the Mount Royal tunnel into Montreal
Engineering Index Backfile | 1915