Project includes 3 passing sidings on 15-mi section of single track from terminal to Texarkana, Ark, to Springdale, Tex, handling 28 scheduled trains daily: control of switches and signals, as well as return of indications to control machine, effected by code handled over three wires extending from Marshall to Texarkana, distance of 67 mi. (See also Ry Signaling v 30 n 2 Feb 1937 p 75-8)
Centralized traffic control on Texas and Pacific
Ry Age
Railway Age ; 102 , n 7
1937
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Centralized traffic control on Texas and Pacific
Engineering Index Backfile | 1937
Centralized traffic control on Texas and Pacific
Engineering Index Backfile | 1935
Centralized traffic control on Missouri pacific
Engineering Index Backfile | 1941
Centralized traffic control on Missouri pacific
Engineering Index Backfile | 1941
Canadian pacific installs centralized traffic control
Engineering Index Backfile | 1944