Illustrated description of works being carried out; lock below Peterborough River being widened and its bed regraded; sluices designed to retain tidal variation of 12 ft with permanent head of 11 ft on upstream side; canalization above Peterborough.
River Nene improvement works
Engineering
Engineering ; 164 , n 4255
1937
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1937
|Engineering Index Backfile | 1937
|Engineering Index Backfile | 1947
Railway swing bridge over the River Nene
Engineering Index Backfile | 1897
Chemikalienpolitik: Nene EU-Chemikalienverorduung besehlossen
British Library Online Contents | 2007