Plan to rebuild railroads in Australia discussed by taking into consideration military needs, present position, present gages, standardization including construction of new lines, transfer yards, converting tracks, structures, rolling stock and Diesel electric locomotives; data on economic conditions given.
Railway scheme
Civ Eng (Lond)
Civil Engineering (London) ; 40 , n 474
1945
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Kashmir electric railway scheme
Engineering Index Backfile | 1899
Railway traffic pooling scheme
Engineering Index Backfile | 1932
Hungarian Railway electrification scheme
Engineering Index Backfile | 1931
Engineering Index Backfile | 1917
|Railway frequency-conversion scheme
Engineering Index Backfile | 1954