Newly completed drydock ship construction basin at Quincy, Mass, is three position graving dock for simultaneous construction of three to six vessels; new basin is 900 ft long and 450 ft wide, and supplements three conventional "sliding" ways capable of handling ships up to 1000 ft in length.
Bethlehem's new construction dock
Mar Engr Naval Architect
Marine Engineer and Naval Architect ; 81 , n 981
1958
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1943
Bethlehem's best snow removal job
Engineering Index Backfile | 1949
|Bethlehem's flash-type distiller
Engineering Index Backfile | 1956
Bethlehem's record of rudder production
Engineering Index Backfile | 1944
Bethlehem's Fore River Yard speeds our two-ocean navy
Engineering Index Backfile | 1941
|