Dec 1957 n 446 p 286-292: Siting, design and construction; pumping plant; dock gates; keel and bilge blocks; factors in crane selection; control of ships entering or leaving dock; diagrams. Jan 1958 n 447 p 313-9: Caissons for dock entrances. Feb n 448 p 353-7: Dock gates. Mar n 449 p 383-9 Apr n 450 p 417-9: Dock pumping machinery. May n 451 p 9-13: Culvert sluices and valves. June n 452 p 55-9 July n 453 p 81-3: Electricity and electrical installations. Aug n 454 p 121-6: Maintenance of mechanical and electrical installations. Oct n 456 p 177-180: Legal aspects of dock construction. Pts 1 and 2 indexed in Engineering Index 1957 p 291.
Modern dry docks: design, construction and equipment
Dock Harbour Authority
Dock and Harbour Authority ; 38 , n 446-450
1957
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Modern dry docks: design, construction and equipment
Engineering Index Backfile | 1957
|Modern docks and their equipment
Engineering Index Backfile | 1929
|Engineering Index Backfile | 1926
|Engineering Index Backfile | 1907
|Design and construction of dry docks
TIBKAT | 1980
|