Planning and construction of Navy's new berthing facilities for Forrestal-class aircraft carriers at San Diego are described; facilities include installation of retractable fender system, camels, and cranes, modification of utilities at existing wharf, and dredging of turning basin and of 6.7 mi deep draft channel in SAN Diego Bay.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Navy's new carrier berthing facilities at San Diego


    Additional title:

    ASCE -- Proc (J Waterways Harbors Div)


    Contributors:


    Publication date :

    1961


    Size :

    14 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Lock carrier for ship berthing

    LIU BO | European Patent Office | 2015

    Free access

    General Berthing Pier Replacement at Naval Base San Diego

    Dahl, Henrik / Connolly, James / Sanchez, Alberto | TIBKAT | 2019


    Navy's super aircraft carrier

    Engineering Index Backfile | 1948


    Navy's Newest Carrier Christened

    British Library Online Contents | 1996


    BERTHING FACILITIES FOR OFFSHORE WIND POWER STRUCTURE

    SHIN MIN YONG / PARK KWAN SIK / LEE OK KYU et al. | European Patent Office | 2015

    Free access