Planning and construction of Navy's new berthing facilities for Forrestal-class aircraft carriers at San Diego are described; facilities include installation of retractable fender system, camels, and cranes, modification of utilities at existing wharf, and dredging of turning basin and of 6.7 mi deep draft channel in SAN Diego Bay.
Navy's new carrier berthing facilities at San Diego
ASCE -- Proc (J Waterways Harbors Div)
1961
14 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
General Berthing Pier Replacement at Naval Base San Diego
TIBKAT | 2019
|Engineering Index Backfile | 1948
Navy's Newest Carrier Christened
British Library Online Contents | 1996