30-yr old locomotive of 221.A class rebuilt, and in addition to streamlined casing over engine and tender, it has been provided with one of latest 48-element super-heaters, A.C.F.I. feedwater heater, mechanical lubrication to axleboxes and cylinders, and most improved form of P.L.M. variable blast pipe; dimensions and illustrations given.
P.L.M. streamlined steam train
Ry Gaz
Railway Gazette and Railway News ; 64 , n 3
1936
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Engineering Index Backfile | 1934
Engineering Index Backfile | 1930
4,000-B.H.P. Locomotives for P.L.M. railway
Engineering Index Backfile | 1937
4,000-B.H.P. Locomotives for P.L.M. railway
Engineering Index Backfile | 1937
High-speed electric locomotives of the P.L.M. railroad
Engineering Index Backfile | 1930
|