Use of pneumatic tired truck trailers in construction of 1,500,000 cu yd rolled earth fill embankment of Little Rock, Ark, new water supply dam on Alum Fork of Saline River; working schedule.
Pneumatic-tired truck wagons move 1,500,000 cu. yd. into rolled Earthfill Dam
Construction Methods Equipment
Construction Methods and Equipment ; 19 , n 12 ; p 54-56
1937
3 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Pneumatic-tired truck wagons move 1,500,000 cu. yd. into rolled Earthfill Dam
Engineering Index Backfile | 1937
Equipment design for use on the pneumatic tired truck
Engineering Index Backfile | 1920
|Dynamometer tests on broad and narrow tired wagons and on plows
Engineering Index Backfile | 1911
|Engineering Index Backfile | 1931
Engineering Index Backfile | 1931