First batch of big program involving single unit cars and 3-car trains for New Zealand Government Railways; power provided by two Leyland 10-liter 6-cyl oil engines developing top output of 130 bhp and one of these engines together with its set of Leyland (Lysholm-Smith) hydraulic transmission is mounted on each truck; all welded construction. (see also Diesel Ry Traction (Supp to Ry Gaz) n 74 Sept 2 1938 p 424-9)
Main-line oil-engined railcars for New Zealand
Gas Oil Power
Gas and Oil Power ; 33 , n 395 ; p 200-201
1938
2 pages
Article (Journal)
English
© Metadata Copyright Elsevier B. V. All rights reserved.
Main-line oil-engined railcars for New Zealand
Engineering Index Backfile | 1938
Main-line oil-engined railcars for New Zealand
Engineering Index Backfile | 1938
Main-line oil-engined railcars for New Zealand
Engineering Index Backfile | 1938
Gardner-engined railcars for South America
Engineering Index Backfile | 1937
Leyland-engined streamlined diesel-mechanical railcars
Engineering Index Backfile | 1937