Centralized traffic control installed by Missouri Pacific Railroad on 27.2 mi of single track between Flinton, Ill, and Raddle Junction; machine has 19 levers for controlling 71 signals, and 20 levers for controlling 17 single switches and 3 crossovers; signals for directing train movements and power switch machines controlled by General Railway Signal Co's Type-F, Class-M, coded system, using three line wires.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    C.T.C. on Missouri Pacific


    Additional title:

    Ry Signaling


    Published in:

    Publication date :

    1938


    Size :

    6 pages


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    C.T.C. on Missouri Pacific

    Engineering Index Backfile | 1938


    Missouri pacific installs C.T.C. on 34 miles

    Engineering Index Backfile | 1937


    Missouri pacific installs C.T.C. on 34 miles

    Engineering Index Backfile | 1937