Construction conditions, methods and plans of Mississippi flood protection; lump unit-price requirements; borrow-pit restrictions; payment practices; track layout for industrial railway operation; standard superflood levee sections; appraisal of construction methods; dragline excavators; slackline cableway excavators; industrial railway haulage; tractor and crawler wagon work; experimental machines. Introductory note by T. H. Jackson.


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    Levee-building operation


    Additional title:

    Eng. News-Rec


    Contributors:
    Hill, C.S. (author)

    Published in:

    Publication date :

    1930


    Size :

    8 pages


    Remarks:

    20 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    Industrial railway equipment for levee building

    French, J.C. | Engineering Index Backfile | 1932


    Dragline excavator development for Levee building

    French, J.C. | Engineering Index Backfile | 1932


    LEVEE TRAVEL DEVICE

    KURIHARA EIJI | European Patent Office | 2022

    Free access

    Federal Levee Safety Guidelines

    Vroman, Noah D. / Sharp, Michael K. | British Library Conference Proceedings | 2018


    Levee Erosion Screening Process

    Huang, Wilbur / Millet, Richard / Shewbridge, Scott E. et al. | HENRY – Federal Waterways Engineering and Research Institute (BAW) | 2010

    Free access