Engines have three cylinders, and are noteworthy for large amount of auxiliary equipment employed; cylinders 18 3/4 by 24 in.; coupled wheels, 4 ft. 6 in.; boiler working pressure 200 lb. per sq. in.; tractive effort at 90 per cent boiler pressure, 28,125 lb.; total weight in working order 90.3 tons; total engine and tender wheelbase 61 ft. (see also Locomotive, vol. 36, no. 458, Oct. 15, 1930, pp. 329-330, 2 figs)


    Access

    Access via TIB

    Check availability in my library


    Export, share and cite



    Title :

    New 4-8-2 locomotives, Nigerian railway


    Additional title:

    Ry. Gaz


    Published in:

    Publication date :

    1930


    Size :

    2 pages


    Remarks:

    3 Figs.


    Type of media :

    Article (Journal)


    Type of material :

    Print


    Language :

    English




    New locomotives for Nigerian railway

    Engineering Index Backfile | 1929


    Locomotives for the Nigerian railway

    Engineering Index Backfile | 1920


    New 4-8-2 locomotives, Nigerian Railway

    Engineering Index Backfile | 1930


    Twenty new 2-8-2 locomotives for Nigerian railway

    Engineering Index Backfile | 1948